Sunday, March 28 - Saturday, April 3, 2021
-
No construction activity due to inclement weather
Sunday, March 21 - Saturday, March 27, 2021
-
Restoration of plain cement concrete (PCC) around catch basin.
-
Installation of granite curb and gutter between Parkland Street SE and Malcolm X Avenue SE.
-
Rectify traffic cabinet foundation at various locations.
-
Placement of planting soil in between granite curb walls of median at Malcolm X Avenue SE and Martin Luther King Jr. Avenue SE.
-
Backfill around the foundation at various locations.
-
Pavement markings at Raleigh Street SE and Malcolm X Avenue SE, northbound and southbound.
Sunday, March 14 - Saturday, March 20, 2021
-
Installation of the streetlights and traffic signal poles at 4th Street SE and 5th Street SE on both sides.
-
Sawcut for median between Parkland Street SE and Malcolm X Avenue SE.
-
Installation and excavation of median between Parkland Street SE and Malcolm X Avenue SE.
-
Rectify traffic cabinet foundation at various locations.
-
Restoration of plain cement concrete (PCC) around catch basin.
-
Installation of granite curb and gutter between Parkland Street SE and Malcolm X Avenue SE.
Sunday, March 7 – Saturday, March 13, 2021:
-
Pulling of wires at the intersections of 5th Street SE and Martin Luther King Jr. Avenue SE and Raleigh Street SE and Martin Luther King Jr. Avenue SE, as well as, Malcolm X Avenue SE and Mellon Street SE.
-
Installation of T-Base between Raleigh Street SE and Mellon Street SE.
-
Installation of streetlights and traffic signal poles on both sides of 4th Street SE towards 5th Street SE.
-
Sawcut for median between Parkland Street SE and Malcolm X Avenue SE.
Sunday, February 28 – Saturday, March 6, 2021:
-
Eradication and placing of temporary paint located on 4th Street SE and Cypress Street SE.
-
Installation of the controller and cabinet at 4th Street SE towards Malcolm X Avenue SE.
-
Pulling of wires at 4th Street SE towards Labaum Street SE and the intersection of 5th Street SE and Martin Luther King Jr. Avenue SE.
-
Installation of cabinets, racking and grounding manholes at intersection at Cypress Street SE and Martin Luther King Jr. Avenue SE.