REHABILITATION OF
ANACOSTIA FREEWAY BRIDGES
OVER SOUTH CAPITOL STREET
REHABILITATION OF
ANACOSTIA FREEWAY BRIDGES
OVER SOUTH CAPITOL STREET
JANUARY 2021
Sunday, January 24 – Saturday, January 30, 2021:
-
Installation of forms for traffic and signal foundation at NEC of 5th Street SE and Alabama Avenue SE.
-
Installation for granite curb at NEC of 5th Street SE, Alabama Avenue SE and Raleigh Street SE.
-
Installation of river rocks for bio-retention facilities at various locations.
-
Installation of traffic and signal foundation at NEC of 5th Street SE and Alabama Avenue SE.
-
Installation of plain cement concrete (PCC) gutter at northbound between 5th Street SE and Raleigh Street SE.
-
Preparation of subgrade for pervious sidewalk at Martin Luther King Jr. Avenue SE, 5th Street SE and Alabama Avenue SE.
-
Eradicate marking pavement between Malcolm X Avenue SE and Raleigh Street SE.
-
Preparation of subgrade for plain cement concrete (PCC) pervious sidewalk, plain cement concrete sidewalk around ADA ramps and tree space at Martin Luther King Jr. Avenue SE and 5th Street SE.
-
Installation of LID fill material at sidewalk 5th Street SE, Alabama Avenue SE and northbound Martin Luther King Jr. Avenue SE.
-
Installation of median sign northbound and southbound along Martin Luther King Jr. Avenue SE.
Sunday, January 17 – Saturday, January 23, 2021:
-
Median work at median between Raleigh Street SE to 5th Street SE.
-
Set up maintenance of traffic (MOT) for utility work and started excavation sidewalk work at the corner 5th Street SE and Alabama Avenue SE.
-
Installation of river rocks for bio-retention at various locations.
-
Excavation for sidewalk, curb and gutter at Alabama Avenue SE and 5th Street SE.
-
Installation of granite curb, gutter and wheelchair ramp at NEC of 5th Street SE and Alabama Avenue SE.
Sunday, January 10 – Saturday, January 16, 2021:
-
Installation of plain cement concrete (PCC) sidewalk at intersection of 5th Street SE and Alabama Avenue SE corner.
-
Installation of plain cement concrete (PCC) sidewalk between 5th Street SE and 4th Street SE.
-
Sawcut and excavation for curb at median between Raleigh Street SE and Parkland Street SE.
-
Backfilling median between Malcolm X Avenue SE to Cypress Street SE.
-
Restoration of plain cement concrete (PCC) for trench between DHS and Milwaukee Street SE.
-
Sawcut for curb at median between Raleigh Street SE to Raleigh Place SE.
-
Restoration of plain cement concrete (PCC) for trenches for traffic conduit between Cypress Street SE to southbound Milwaukee Street SE.
-
Excavation for curb at median between Raleigh Street SE to Raleigh Place SE.
-
Installation of plain cement concrete (PCC) bus stop pad at southbound near intersection of Martin Luther King Jr. Avenue SE and Milwaukee Place SE.
-
Installation pervious sidewalk between 4th Street and Alabama Street SE.
Sunday, January 3 – Saturday, January 9, 2021:
-
Placement of stones for pervious sidewalk northbound between 4th Street SE and 5th Street SE.
-
Removal of maintenance of traffic (MOT) layout between Cypress Street SE to the end of project.
-
Installation of temporary pavement markings between Raleigh Street SE, Randle Place SE and from Lebaum Street SE to Cypress Street SE for median work.
-
Saw cut for median work at intersection between Lebaum Street SE and Cypress Street SE.
-
Set up maintenance of traffic (MOT) for utility work on Martin Luther King Jr. Avenue SE.
-
Excavation for planting soil and pervious sidewalk at northbound between 4th Street SE and 5th Street SE.
-
Stripping of lines for phase 4 between Randle Place SE and Lebaum Street SE.
-
Installation of plain cement concrete (PCC) sidewalk and wheelchair ramp at intersection of 5th Street SE, Alabama Avenue SE and Martin Luther King Jr. Avenue SE.
-
Sawcut and excavation for curb and gutter at median between Mellon Street SE and Malcolm X Avenue SE.
-
Restoration of plain cement concrete (PCC) for trench between Cypress Street SE and Milwaukee Street SE.
-
Placement of plain cement concrete (PCC) base as restoration of roadway today between Milwaukee Avenue SE, 5th Street SE and southbound Martin Luther King Jr. Avenue SE.
-
Placement of concrete at pedestal signal and lighting foundations.